The number of rafters needed will be determined by the length of your roof.
Roof sheeting hip plumb cut.
How to install roof sheathing roof framing part 8 duration.
See saw miter and blade angle settings.
Measure back from this line and mark a second parallel line on both sides of the hip.
Mark the end plumb cut angle line back from square on both sides of the hip.
A tapered piece of sheathing can be cut to fill in at the eave if necessary.
How to layout and cut hip and valley roof rafters duration.
This is the line to cut along.
Don t cut yet 2.
This is the pointy end.
With the saw bevel angle set to 45 cutting hips and creepers at the plumb cut angle will produce correct side angles.
When one slope is completely sheathed pop a chalk line down any slope edge as in a hip roof that needs to be cut at an angle.
Sheath one slope of the roof at a time ripping the top course to the needed width at the ridge.
Hip roof framing rafter cut angle template diagram.
All roof rafters should be identical so follow the same steps to measure the plumb cut tail cut and birdsmouth cut.
Depending on the size of your structure you will need to cut several or many more.
Doublewide6 repairs llc 310 141 views.
The easiest way to make an roof sheathing stick is to lay the first plywood sheathe across the hip rafter and lay a stick parallel with the hip rafter and drive two.
At this point you ve cut 1 roof rafter.